Client Description Contract Period Date Completion
PKNS Infra Berhad Propose design, build, testing commissioning and maintenance of Putra Height interchange and toll plaza at KM 13.2 North South link expressway for sime uep Heights Sdn. Bhd. 15.03.2007 To 14.01.2009 09.01.2009
Damai Setia Sdn. Bhd. Kerja-kerja menaiktaraf Tiga(3) Jalan Ladang di Wilayah III, Mada. 10.12.2008 To 15.09.2009 30.04.2009
Damai Setia Sdn. Bhd. Cadangan pembinaan jambatan dari simpangpan chor pengkalanDatu, Mukim Panchor, Daerah Kemumin, Kota Bahru, Kelantan. 17.02.2009 To 14.08.2010 31.10.2009
PKNS Infra Berhad Construction of roadworks, roadside drain, water reticulation and sewer reticulation (package 4) at proposed integrated township development of Bandar Bukit Raja (stage 1), MukimKapar, Daerah Klang, Selangor Darul Ehsan. 24.09.2008 To 23.12.2009 23.11.2009
SimeUep Centre SdnBhd Proposed Design and Build of a New Pumping Station and Reticulation Works Including Related Works for the Subang Jaya City Centre (SJCC) Development at Subang Jaya for Sime UEP Centre Sdn Bhd. 08.04.2010 To 07.02.2011 15.09.2010
Negara Properties Realty Sdn Bhd Proposed Construction and Completion of Infrastructure Works and TNB Substation At Zone 6A Development Of Nilaiimpian&NilaiUtama, MukimSetul, Daerah Seremban, Negeri Sembilan darulKhusus. 24.02.2010 To 01.12.2010 28.11.2010
PLUS Malaysia Berhad Proposed Pavement rehabilitation And Associated Works At KM 32.0 – KM 29.7 Southbound, Along Malaysia – Singapore Second Crossing, Section S5. 14.06.2010 To 04.11.2010 01.11.2010
Ranhill Engineers And Constructor SdnBhd Senai – PasirGudang – Desaru Expressway Package 3C/6 (480mm ALTERNATIVE DESIGN PAVEMENT) 09.06.2009 To 31.01.2011 31.01.2011
MiedCapital SdnBhd The execution and completion of Mosque for the Asian Institute of Medicine Science and Technology University MukimSemeling, Daerah Kuala Muda, Kedah DarulAman. 10.03.2010 To 12.01.2012 30.03.2012
Mohd Asbi & Associates CadangMembinaJalanKeluarMasuk Di KM 18.5 Lebuhraya Persekutuan (Arah Kuala Lumpur) Bandar Glenmarie Daerah PetalingUntukBisraya . SdnBhd Shell Trading Malaysia SdnBhd Dan Bonus SaujanaSdn Bhd. 05.07.2010 To 03.01.2011 27.03.2012
PLUS Malaysia Berhad Proposed Bukit Gambir Interchange and Toll Plaza (Phase 1 – Advanced Earthworks) 12.08.2010 To 10.08.2011 20.01.2013
PKNS Infra Berhad Cadangan ,Merekabentuk, MembinadanMenyiapkan 1422 Unit RumahBerkembarSatu Tingkat danKerja-kerjaInfrastruktur Yang BerkaitanuntukPenempatanSemulaSetinggan Bukit Botak (Taman SelayangMutiara) Bandar BaruSelayang, MukimBatu, Daerah Gombak, Kuala Selangor, Selangor DarulEhsan. 11.08.2010 To 10.05.2012 16.07.2012
PLUS Malaysia Berhad Proposed Sungai Buaya Interchange and Toll Plaza 14.06.2011 To 13.07.2013 15.10.2013
Sime Darby Elmina Development SdnBhd The Construction and Completion of Main Infrastructure Works and 6 NOS TNB Sub-Stations at Precint A of Elmina East Development, Shah Alam, Selangor DarulEhsan. 29.08.2013 To 28.08.2014 02.05.2015
Sime Darby Ainsdale Development SdnBhd Proposed Construction And Completion Of Main Drain On Part Of Lot 32827 and Part Of Lot PT 32127, Daerah Seremban, Negeri Sembilan DarulKhusus For Proposed Mixed Development (Residental And Commersial) For Bandar Ainsdale And S2 Height (Phase 3A), MukimRasah, Daerah Seremban, Negeri Sembilan. 02.04.2015 To 16.07.2015 16.07.2015
JabatanKerja Raya (JKR) Menaiktaraf Jalan Muar – Tangkak – Segamat, Johor (Fasa 1 : Segamat – Tangkak) Pakej 1B 01.11.2011 To 15.11.2015 30.07.2015
Sime Darby USJ Development SdnBhd Proposed Reparation Of The Existing Main Road & Drainage At Ph. 11 And Ph. 14, Laying Of Main Road Pavement Final Layers At Ph. 11, Ph.14 And Eastern Division, And Installation Of Safety Railing At Main Roads Ph. 11 And Ph. 14 For Handing Over To Mpk For Proposed Intergrated Township Development Of Bandar Bukit Raja (Stage 1) On Lots 19, 25, 27, 52, 1635, 13046 And 13047 MukimKapar, Daerah Klang, Selangor DarulEhsan 07.01.2016 To 20.06.2016 24.05.2016
Symphony Hills Sdn Bhd.(UEM Groups) Proposed Development On 448.61 Acres of Land on Lot 18370 (PT 21628), Mukim of Semenyih, Daerah Hulu Langat, Selangor DarulEhsan For Sysmphony Hills Sdn. Bhd. (“Serene Heights”) 28.08.2015 To 27.08.2016 27.08.2016
Sime Darby USJ Development Sdn Bhd Proposed Laying Of Main Road Pavement Final Layers And Other Ancillary Works For Phases 1, 4, 12, 13 And Eastern Division For Handing Over To Mpk For Proposed Integrated Township Development Of Bandar Bukit Raja (Stage 1) On Lots 19, 25, 27, 52, 1635, 13046 And 13047 MukimKapar, Daerah Klang, Selangor DarulEhsan. 16.12.2016 To 02.07.2017 05.05.2017
Sime Darby USJ Development SdnBhd Proposed Site Clearance & Earthworks At Gateway 3 For Proposed Development Of Commercial And Industrial Plot On Pt 69356, Pt 71350, Lot 98114 & Lot 34026, Bandar Bukit Raja (Stage 1, Eastern Division), MukimKapar, Daerah Klang, Selangor DarulEhsan 29.03.2017 To 28.12.2017 06.12.2017
Sime Darby USJ Development Sdn Bhd Proposed Design, Build, Testing, Commissioning And Maintenance Of Improvement Works To Putra Heights Interchange And Toll Plaza At KM 13.2 North South Central Link Expressway Sime Darby USJ Development Sdn Bhd. 26.04.2017 To 25.02.2018 25.02.2018
Sime Darby USJ Development Sdn Bhd Proposed Construction And Completion Of Earthworks And Other Related Works For Development Of R03, At Part Of G.24130 (Lot 24), G.24132 (Lot 25), G.46056 (Lot 5645 & 5646), G.46057 (Lot 5647 & 5648) And G.51050 (Lot 86), At Bandar Bukit Raja 2, District Of Klang, Selangor DarulEhsan For Messrs. Sime Darby USJ Development Sdn. Bhd. 29.03.2017 To 28.04.2018 28.04.2018
Jabatan Pengairan Dan Saliran (JPS) Kerja-kerja Menaiktaraf Sungai Kesang Dari CH 0 (Muara Sungai Kesang) ke CH 34000 (Hulu Sungai Kesang) dan Kerja-kerja Berkaitan Bagi Rancangan Tebatan Banjir (RTB) Lembangan Sungai Kesang (TawaranSemula). 15.08.2016 To 14.08.2018 13.08.2018